When the building was purchased it was empty. The concrete and steel shell was used to build this building inside. Care was taken to dampen sound from the outside and internally. Over insulation keeps hvac costs exceptionally low for the size.
Separate heat and AC equipment effectively offers 3 controlled zones.
There is private parking for 6-7 cars in back and unlimited parking adjacent in the town lot.
As stated, this would be pretty close to a turnkey facility for an owner/ user. An investor might come up with a different idea for the space but he or she would find a very cooperative town and county .
Here is one idea for your consideration.
Contact me for a appointment to walk the property.
Ed Jaffe PO Box 566 Orange, VA 22960. 540-672-2400
sculpture@edjaffe.com